Muradiye Ayrancılar HEPP, which consists of Şelale HEPP and Ayrancılar HEPP, which was established in 2011, is located in Muradiye district of Van province. The power plant has a total of 17,707 m of water transmission lines and the power plant is connected to the electricity grid from the Ayrancılar Transformer Station (TS) transmission level.